Who we work with

Working with architects and designers in Los Angeles

Good buildings and even better project delivery experiences depend on the architect and the builder who work together. We review the design documents in detail, bring questions to your team before they reach the owner, and carry the design intent into the field.

During design

A budget built from your drawings

We price your design at each phase, from the concept package to construction documents, so the owner sees the cost of a decision while there is still time to change course. Each estimate lists the scope by trade, with every allowance, hold and exclusion named, so it is clear what the budget includes and which issue of your drawings it was priced from. We price the project you designed, including estimating the unknowns in the drawings where scope has not been fully developed, so the client doesn’t hear about scope gaps from drawings that were not complete yet. What the owner receives at each stage is set out under preconstruction services.

We track an open items list during design and an RFI log during construction, and work through both with your team, so every item needed to price the project accurately, and then to build it, has an answer. Where an allowance is appropriate, we state its basis, and where the team needs an investigation or a design decision, we identify that next step.

Before a hard number is asked for, we review the set with your team: how far each discipline has developed, where the engineering and the architecture still need to be coordinated, and whether the existing conditions have been surveyed or assumed. We work through the drawing questions with your team so the scope, assumptions and open decisions can be explained clearly to the owner.

The goal is a permit set that is in line with budget and schedule expectations, and maintains the original design intent.

In the details

Samples and mockups before a detail repeats

The character of a space often depends on how the details come together, and most of those details sit where one trade meets another. We work through those points with your team and the trades who build them, from millwork and stone to lighting and exposed services, while there is still room to change them.

Samples and mockups are standard practice on our projects. Your team reviews the sample or the mockup before a detail is repeated through the space, and what was agreed at that review is what the trades build from.

Owner-furnished and designer-specified items are received, stored, protected and installed on a plan agreed with your team, and finished work is protected until handover.

During construction

Questions come to you first, not to the owner

We work back from procurement and installation dates to plan drawing questions and submittal reviews. An RFI identifies the relevant sheets, the decision needed and its required date, with a proposed approach where we can offer one. The three-week look-ahead keeps those decisions connected to the work in the field. Every submittal is checked against your drawings and specifications before it reaches you, and every question or RFI is referenced against the drawings before it is sent to you. No product is substituted without your review.

When the field runs into something that doesn’t align with the drawings, we stop and call you before it is built, with the drawing details to reference and our proposed solution. The owner hears about it from both of us, with a recommendation.

Your briefing

Time to answer, not a same-day deadline

Owners, architects and trade partners each need different things from the same project. Your team gets its own briefing, weekly or on the cadence you prefer: the questions waiting on you, the submittals waiting on your review, the review dates coming up and what the field needs next, so a question reaches you with time to answer it, not as a same-day emergency.

Design team briefingFriday
  1. 2RFIs waiting on you, each with the sheets and a proposed approach
  2. 3 daysUntil the next answer is needed from you
  3. 3Submittals in your review, checked against the specification by us first
  4. 0Substitutions requested
  5. TuesdayMillwork mockup to walk with your team

Questions

What design teams ask us

Will you redesign our project to hit a number?

No. When the design and the budget are not aligned, we show the team the cost drivers of the project, and offer options where the same result can be built more efficiently. Which option to take is a design decision, and it stays with you and the owner.

When in the design should we bring you in?

At concept if you can. That is when we can provide initial feedback on constructability and schedule, and it is the earliest point to learn whether the budget and the design are aligned.

Do you substitute products?

Not without your review. If a specified product has an availability problem, we bring the options and schedule implications to your team for review, with the owner involved in decisions that affect scope or cost. Where a substitute has a substantial impact on design, we mock it up first.

Start with a conversation

Let’s talk about your project

Tell us what you are planning, where the design stands and the date you are working toward. We will call to talk it through.