The first questions are about your space and what it needs.
Before you commit to construction, you need to understand what the estimate includes and what is still unresolved. If you have built before, you already know that. It is the part from the last project you remember if the estimate and the final budget didn’t align.
At concept, we examine what the design asks of the building.
There is a second worry underneath that one: that bringing a builder in early means giving up competitive bidding, and that a number is hard to judge when the contractor already expects the job. Most owners are also not in the design meetings week to week, so they cannot tell whether the drawings are ready to build until construction has started and the gaps show up as changes.
Scope and assumptions need to be clear before construction starts.
Here is what preconstruction looks like when we run it. Before we price anything, we tell you whether the set is ready to be priced: how far along the design is, whether the utility scope is clear, and the schedule and budget risks if the project starts before design is complete. Then we read your drawings the way we would build them, sheet against sheet. We track an open items list and coordinate with the design team through closure. Whatever cannot be answered yet becomes a named allowance with a clear estimate.
We raise code questions while design is in progress.
We assist the design team as a second set of eyes and with an overall code review, to avoid or minimize the corrections that often come up during inspections in the field, even on items that passed plan check.
Concealed conditions are a part of the site investigation.
The existing building conditions get a thorough review, because most of our work is renovation and the existing building conditions need to be incorporated into the design. We walk the space with the set in hand: the electrical service, the sewer line, the structure the new use will load, the ceiling nobody has been above in twenty years. What the walk cannot settle becomes an investigation with a proposed budget and the value it provides. The code review happens in the same pass, on paper, where it is cheap: accessibility, fire and life safety, the kitchen infrastructure a restaurant needs, and the energy requirements a tenant improvement triggers.
We coordinate the details before the trades meet in the field.
What comes back to you is a detailed plan to execute the project with backup. It lists the detailed scope by trade, every allowance by name, and every hold and exclusion, so you can set it beside any other bid and see what each one left out. We treat every bid and preconstruction engagement as if we are already responsible for building the job, and we ensure the proper due diligence has been completed before our estimate is shared.